Team Capacity Planner
Capacity PlannerMonthly staff capacity
Data source WorkflowMAX

Capacity

Needs attention

Teams

Planned vs actual

Actual = hours logged in WorkflowMAX timesheetsSample data

Coming monthsUtilisation by person, last month to three months ahead

Click a cell to open that person's month. Striped months are still being planned, so low figures there show as “Not yet planned”.

Staff

Team

Who appears in the dashboard, their office and team, and their productivity target. Names must match the staff name in WorkflowMAX exactly.

Leave ·

Known leave days per person per month. Leave reduces that person's net working days and target capacity for the month.

Working days ·

Working days are weekdays minus public holidays. Enter an override only where the business uses a different figure.

Data

Where the numbers come from. Connect WorkflowMAX, or import the two WorkflowMAX report exports as CSV.

WorkflowMAX connection

Demo simulation

This demo doesn't talk to WorkflowMAX. Connecting loads the built-in sample data, so you can see how a live sync would work.

Planned hours

Job task allocations report
Paste from Excel instead

Actual hours

Timesheet report
Paste from Excel instead

Data as at

Start over

Go back to the built-in sample data. Your team, targets, leave and working days are kept.

Settings

How capacity and status are calculated, and where the data comes from.

Capacity

hours

Status thresholds

%
%
%
On track
Everything in between.

Data source

Backup & reset

Team, targets, leave, working days and settings are saved in this browser. Copy a backup to move them to another computer or share them with a colleague, then restore it with Import backup.

Guide

How the numbers are calculated and what has improved on the spreadsheet.

How capacity is calculated

  • Net working days = working days in the month − known leave days.
  • Target capacity = productivity target × net working days × hours per day.
  • Allocated hours = planned time allocated to that person in WorkflowMAX, for jobs starting in the month.
  • Utilisation = allocated hours ÷ target capacity. 100% means someone is allocated exactly to their target.
  • Actual utilisation = hours recorded in WorkflowMAX timesheets ÷ target capacity. For the current month both are measured to date, so planned and actual compare like for like. In this demo the timesheet hours are sample data.

Status

  • Over target above 100% · Near target 85-100% · On track 50-85% · Under-utilised below 50%. Thresholds can be changed in Settings.
  • For months after today, low figures show as Not yet planned, because work is usually allocated closer to the month.
  • Anyone with allocated hours but no capacity (e.g. on leave all month) counts as over target.

Improvements on the spreadsheet

  • Office and team totals are calculated from each person's office and team, rather than fixed cell references. This also corrects two totals that were picking up the wrong people.
  • Leave is kept for every month, so entering next month's leave no longer overwrites this month's.
  • Months are matched on month and year, so work in a future financial year can't land in the current one.
  • People who have allocated time in WorkflowMAX but aren't set up in the Team list are flagged, rather than silently left out.
  • Trends, year-to-date, forward cover, rebalancing suggestions and a full profile for every person.

Interactive tools in this demo

  • What-if moves. Use Try this move on a suggestion, the What-if button, or W to move planned hours between people. Every figure updates straight away, and nothing changes in WorkflowMAX. Copy the moves as a list to send to the team.
  • Data tab. Simulate a WorkflowMAX connection, or import the job task allocations and timesheet reports as CSV.
  • Data date. Change the "as at" date to see how the dashboard looks on another day.
  • Keyboard. Press ? for shortcuts.

Current limitations

  • Jobs spanning several months are counted in their start month.
  • One working-days calendar is used for all offices; separate NSW and VIC calendars can be added.
  • Allocations are planned time. Actual timesheet hours can be added for past months.

Try a what-if move

Move planned hours from one person to another and see the effect straight away. Nothing changes in WorkflowMAX.

Keyboard shortcuts

← →
Previous or next month
1 to 8
Switch tabs
/
Find staff
W
Try a what-if move
Z
Undo the last what-if move
Esc
Close a panel or dialog
?
Show this list